Building Envelope
Learning Units: 1.0 AIA LU/HSW
Provided By: BD+C - Campus Sponsor
Learning Units: 1.0 AIA LU
Provided By: BD+C - Campus Sponsor
Learning Units: 1.0 AIA LU/HSW
Provided By: BD+C - Campus Sponsor
Learning Units: 1.0 AIA LU/HSW
Provided By: BD+C - Campus Sponsor
Learning Units: .25 AIA LU/HSW
Provided By: New Millennium Building Systems - Campus Sponsor
Learning Units: 1.0 AIA LU/HSW
Provided By: Metl-Span - Classroom Sponsor
Provided By: Technoform - Classroom Sponsor
Learning Units: 1.0 AIA LU/HSW
Provided By: BD+C - Campus Sponsor
Learning Units: 1.0 AIA LU/HSW
Provided By: Technoform - Classroom Sponsor
Learning Units: 1.0 AIA LU/HSW
Provided By: BD+C - Campus Sponsor
Provided By: MBCI - Campus Sponsor
Provided By: MBCI - Campus Sponsor
Provided By: Vitro Architectural Glass - Classroom Sponsor

For the reconstruction of a high school in the United Kingdom, the project team removed concrete spandrel panels and installed a new steel structure for added floor area and a unitized curtain wall of translucent fiber-reinforced polymer. This pumped more daylight into classrooms without unwanted gains to heating and cooling loads. Photo courtesy of Kalwall
Learning Units: 1.0 AIA LU/HSW
Provided By: BD+C - Campus Sponsor
Provided By: Huber Engineered Woods LLC - Campus Sponsor
Provided By: Huber Engineered Woods LLC - Campus Sponsor
Provided By: Owens Corning - Studio Sponsor
Provided By: Fabcon Precast - Classroom Sponsor
Provided By: Echelon Masonry - Studio Sponsor
Provided By: Echelon Masonry - Studio Sponsor